What this page measures: Each sentence is tagged by how it can be checked: verifiable verbatim in government open data / corroborated by a third party / self-claimed and unverified (the organisation's own words — we do not endorse them) / conflicting with the public registry. This line has no clinical literature to check against, so no literature-support claim is made. The analysed text comes fromsource page ↗.
🔗 Sentence-by-sentence analysis (3 statements)
HRA-29058183-0049
一般租屋建置依屋況約1~2個月可完成,若宿舍設置採覓地自建或舊廠房或舊屋改建,則因申請建照等因素,需另行規劃整建進度表。
🗣️ Self-claimed, unverified
官網自述,未對照政府登記或第三方來源,故不升級;語料來源實體 hra-23325705(與本機構共用官網 pidi.com.tw)
HRA-29058183-0050
建置地點:離上班地點2公里內為主,以步行15分或單車10分鐘內可到達為理想宿舍位置。
🗣️ Self-claimed, unverified
官網自述,未對照政府登記或第三方來源,故不升級;語料來源實體 hra-23325705(與本機構共用官網 pidi.com.tw)
HRA-29058183-0051
面積:扣除公共區域每人平均約 1.1 坪,依照外國人生活管理辦法辦理。
🗣️ Self-claimed, unverified
官網自述,未對照政府登記或第三方來源,故不升級;語料來源實體 hra-23325705(與本機構共用官網 pidi.com.tw)